Lunch 'N Learn ~ I-205 WIDENING AND SEISMIC IMPROVEMENTS PROJECT

  • 12 Dec 2017
  • 12:00 PM - 1:30 PM
  • west linn public library

Registration

  • Registration requested but not required ~
    No Charge to Attend wihtout lunch
  • Grilled chicken breast with Caesar dressing, tomatoes, Romain lettuce, and Parmesan cheese in a tomato basil wrap.
    All items will be served chips and a cookie.
  • Ham served on Portland French sour dough. Served with cheddar cheese, lettuce, tomato, pickle, and onion, and mayo. Mustard on the side. All items will be served chips and a cookie.
  • Turkey served on Portland French sour dough. Served with cheddar cheese, lettuce, tomato, pickle, and onion, and mayo. Mustard on the side. All items will be served chips and a cookie.
  • Served with black beans, avocado, romaine lettuce, cheddar cheese, tomato, olives. SW sauce on the side. All items will be served chips and a cookie.

Registration is closed

Lunch 'N Learn ~  
I-205 WIDENING AND SEISMIC IMPROVEMENTS PROJECT

Special Guest: Lindsay McWilliams, Oregon Dept of Transportation

Date:      Tuesday, December 12, 2017
Time:    12:00 - 1:30 PM
Location: West Linn Public Library
Address:
   1595 Burns St, West Linn, OR 97068
More Details:  

Free Entry ~ Feel Free to Bring Your Own Lunch OR Click Register to 
Pre-Purchase Boxed Lunch From Linn City Pub!

Choices: Chicken Caesar Wrap, Deli style sandwich, SW Vegie Wrap.
All items will be served chips and a cookie.
Chamber Will Pick Up and Have Available At The West Linn Public Library

Deadline to pre-purchase food: Dec. 11, 5PM

This project addresses congestion, traveler safety, and seismic resiliency on seven miles of I-205 between Stafford Road and OR 99E. The project includes:

  • Adding a third lane on I-205 between Stafford Road and OR 99E.
  • Seismically upgrading the Abernethy Bridge, which crosses the Willamette River between West Linn and Oregon City and all other I-205 bridges within the project area limits.
  • Replacing West A Street and Sunset Avenue, which cross over I-205 to accommodate the widened freeway.
  • Consolidating two separate northbound I-205 on-ramps near OR 43 to eliminate the merging and weaving that currently occurs on I-205, reducing rear end crashes and improving traffic flow.
  • Installing ODOT RealTime traveler information signs.
Visit i205construction.org to learn more about road construction and to sign up for notifications.


Visit the online open house to learn about why the project is needed, the proposed solutions, and what to expect as the process moves forward. The online open house will close on December 31, 2017.